October 2018

MPE launches the New Logistic Warehouse!

Within a framework of global growth and to keep up with the ever more restrictive requirements of the market, MPE has invested in the construction of a new and innovative automatic warehouse, which allows to optimize both time and space and to create new business opportunities.

The new building, which is located just a few meters away from the production plant in Villanova, is equipped with a pallet racking system moved by two automatic guided vehicle (AGV) on rolling basis. This structure facilitates the growth of the current storage capacity maintaining the maximum flexibility.

The covered surface of the warehouse is 2.300 s.m and the capacity reaches 5.100 pallet places.

The new storehouse will enable to recover space from the previous storage areas, while developing production capabilities and optimizing work flows.